Project management for themajor renovationof the sports hall ofParis Bercy

Paris (75)

 

Iconic building of Paris, Ihe POPB is an emblematic building in Paris, one of those which contributed to strengthening the East of the City, precursor of the era of the works of the Ministry of Finance in the immediate vicinity, and of the François Mitterrand Library which makes it facing left bank. The objectives of the renovation are ambitious: to breathe new life into Bercy, to bring the hall up to the level of the largest arenas in the world in terms of hosting events and the public, and to include the project in an eco-responsible approach.

Requalification of outdoor spaces

ATEVE is mainly involved in the requalification of the outdoor spaces of the Palais Omnisport. On the program, the complete resumption of the insulation, the waterproofing and the surface coverings of the passageways and the grassy embankments, the bringing to the standards of accessibility of the building by the removal of the steps of the main access and by the development of a PMR ramp nested in steps on a drop of 5.50 m and the qualitative treatment of the surroundings of Bercy Aréna.

 

POPB_Chantier4.JPG

POPB_Chantier4.JPG

POPB_Chantier1.JPG

POPB_Chantier1.JPG

POPB_Chantier2.JPG

POPB_Chantier2.JPG

POPB_Chantier5.JPG

POPB_Chantier5.JPG

POPB_Chantier3.JPG

POPB_Chantier3.JPG

Owner:SAE POPB

Project Owner Delegate :SEMAEST

Place:Paris (75)

Partners:

Daniel Vaniche and associates (Agent architect)

DVVD (Associated Architects and BET Structure)

ALTO engineering (BET Fluids and HQE)

SEPIAGC (BET Geotechnics and Civil Engineering)

PEUTZ&ASSOCIATES (Acoustics BET)

POPULOUS (Architect specializing in Arenas)

GARDINER&THEOBALD (Construction Economist)

SYSTAL (Kitchen BET)

ZAGASS DESIGN (Signage designer)

CABINET 4C (BET Asbestos)

Total amount of works:96 000,000 € excluding tax

Certification :City of Paris Climate Plan

Amount of VRD works : 3 730,000 € excluding tax

Surface :62 000 m²

External surfaces rehabilitated:20,000 m2

Completion date of the work:September 2015

bottom of page