ASSIGNMENT: STUDY FOR THE CREATION OF AN INTERCONNECTION OF THE SNCF AND RER STATIONS WITH THE CREATION OF A BRIDGE " PAYSAGER " AND A BRIDGE BUILDING OVER THE STATION TRACKS PLEYEL AT COURNEUVE

 

DEVELOPMENT OF THE PROVISIONAL FORECAST OF THE STATION

 Study of PMR pathways

 Study of leveling;

· Dimensioning and integration of strong current / weak current / video / rainwater networks of the temporary forecourt;

 Work estimate

NETWORK DIAGNOSIS

  Checking of existing network plans based on operator feedback to DT-DICT;

 Identification and follow-up of dealer diversions;

Owner:

SNCF

Place :

La Courneuve (93)

 

Partners:

ARTELIA (Bet structure)

DVA (Architect)

DVVD (Bet structure)

 

Amount of work :

Parvis BV: €200 million excluding tax