top of page
ASSIGNMENT: STUDY FOR THE CREATION OF AN INTERCONNECTION OF THE SNCF AND RER STATIONS WITH THE CREATION OF A BRIDGE " PAYSAGER " AND A BRIDGE BUILDING OVER THE STATION TRACKS PLEYEL AT COURNEUVE
DEVELOPMENT OF THE PROVISIONAL FORECAST OF THE STATION
Study of PMR pathways
Study of leveling;
· Dimensioning and integration of strong current / weak current / video / rainwater networks of the temporary forecourt;
Work estimate
NETWORK DIAGNOSIS
Checking of existing network plans based on operator feedback to DT-DICT;
Identification and follow-up of dealer diversions;
Owner:
SNCF
Place :
La Courneuve (93)
Partners:
ARTELIA (Bet structure)
DVA (Architect)
DVVD (Bet structure)
Amount of work :
Parvis BV: €200 million excluding tax
bottom of page